This fall has been a busy time around the Ashram with the renovation of the Hall on the ground floor. The carpeting was removed and replaced with a bamboo floor, the lighting was replaced and the walls repainted. A new cabinet was built in the kitchen for more storage space. A new door was installed at the top of the steps.